Research & information: general books

88938 books were found.

An Exobiological Strategy for Mars Exploration

An Exobiological Strategy for Mars Exploration

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722181727
Format: Paperback
$65.97

The idea of searching for evidence of life on Mars may strike some as far-fetched, even fanciful. But there is a...  Read More >>

An Improved Gravity Model for Mars: Goddard Mars Model-1 (Gmm-1)

An Improved Gravity Model for Mars: Goddard Mars Model-1...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722184353
Format: Paperback
$65.97

Doppler tracking data of three orbiting spacecraft have been reanalyzed to develop a new gravitational field model...  Read More >>

Aldas User's Manual

Aldas User's Manual

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722172091
Format: Paperback
$65.97

The Acoustic Laboratory Data Acquisition System (ALDAS) is an inexpensive, transportable means to digitize and analyze...  Read More >>

Algorithms for Performance, Dependability, and Performability Evaluation Using Stochastic Activity Networks

Algorithms for Performance, Dependability, and Performability...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722172695
Format: Paperback
$65.97

Modeling tools and technologies are important for aerospace development. At the University of Illinois, we have...  Read More >>

An Inelastic Analysis of a Welded Aluminum Joint

An Inelastic Analysis of a Welded Aluminum Joint

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722184704
Format: Paperback
$65.97

Butt-weld joints are most commonly designed into pressure vessels which then become as reliable as the weakest increment...  Read More >>

An Electrochemical Study of Corrosion Protection by Primer-Topcoat Systems on 4130 Steel with AC Impedance and DC Methods

An Electrochemical Study of Corrosion Protection by...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722180300
Format: Paperback
$65.97

To investigate metal surface corrosion and the breakdown of metal protective coatings, the ac impedance method is...  Read More >>

An Approach to the Constrained Design of Natural Laminar Flow Airfoils

An Approach to the Constrained Design of Natural Laminar...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722177904
Format: Paperback
$65.97

A design method has been developed by which an airfoil with a substantial amount of natural laminar flow can be...  Read More >>

An Integrated Optimum Design Approach for High Speed Prop Rotors

An Integrated Optimum Design Approach for High Speed...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722194918
Format: Paperback
$65.97

The objective is to develop an optimization procedure for high-speed and civil tilt-rotors by coupling all of the...  Read More >>

An Integrated Cfd/Experimental Analysis of Aerodynamic Forces and Moments

An Integrated Cfd/Experimental Analysis of Aerodynamic...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722194895
Format: Paperback
$65.97

Aerodynamic analysis using computational fluid dynamics (CFD) is most fruitful when it is combined with a thorough...  Read More >>

An Investigation of the Use of Temporal Decomposition in Space Mission Scheduling

An Investigation of the Use of Temporal Decomposition...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722229627
Format: Paperback
$65.97

This research involves an examination of techniques for solving scheduling problems in long-duration space missions....  Read More >>

Analysis of Advanced Optical Glass and Systems

Analysis of Advanced Optical Glass and Systems

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722232122
Format: Paperback
$65.97

Optical lens systems performance utilizing optical materials comprising reluctant glass forming compositions was...  Read More >>

Analysis and Use of Vas Satellite Data

Analysis and Use of Vas Satellite Data

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722232054
Format: Paperback
$65.97

Four interrelated investigations have examined the analysis and use of VAS satellite data. A case study of VAS-derived...  Read More >>

Annoyance Caused by Advanced Turboprop Aircraft Flyover Noise: Counter-Rotating-Propeller Configuration

Annoyance Caused by Advanced Turboprop Aircraft Flyover...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722239251
Format: Paperback
$65.97

Two experiments were conducted to quantify the annoyance of people to flyover noise of advanced turboprop aircraft...  Read More >>

Analysis and Effects of the Advanced Solid Rocket Motor on the Space Shuttle Elements

Analysis and Effects of the Advanced Solid Rocket Motor...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722231545
Format: Paperback
$65.97

This interim final report summarizes the activities and major accomplishments under NASA/MSFC Contract NAS8-39235...  Read More >>

Antenna Beam Coverage Concepts

Antenna Beam Coverage Concepts

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722239855
Format: Paperback
$65.97

The strawman Personal Access Satellite System (PASS) design calls for the use of a CONUS beam for transmission between...  Read More >>

Analysis of Pultrusion Processing for Long Fiber Reinforced Thermoplastic Composite System

Analysis of Pultrusion Processing for Long Fiber Reinforced...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722235468
Format: Paperback
$65.97

Pultrusion is one of the composite processing technology, commonly recognized as a simple and cost-effective means...  Read More >>

Analysis of Positron Lifetime Spectra in Polymers

Analysis of Positron Lifetime Spectra in Polymers

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722234904
Format: Paperback
$65.97

A new procedure for analyzing multicomponent positron lifetime spectra in polymers was developed. It requires initial...  Read More >>

Analytical Derivation and Verification of Zero-Gyro Control for the Iue Satellite

Analytical Derivation and Verification of Zero-Gyro...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722238162
Format: Paperback
$65.97

The International Ultraviolet Explorer (IUE) satellite was launched January 26, 1978 into a geosynchronous orbit...  Read More >>

Analytical and Experimental Studies of a Short Compact Subsonic Diffuser for a Two-Dimensional Supersonic Inlet

Analytical and Experimental Studies of a Short Compact...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722238063
Format: Paperback
$65.97

An experimental study of a two-dimensional supersonic inlet with a short compact subsonic diffuser, length to exit...  Read More >>

Analysis of the Shuttle Orbiter Reinforced Carbon-Carbon Oxidation Protection System

Analysis of the Shuttle Orbiter Reinforced Carbon-Carbon...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722236953
Format: Paperback
$65.97

Reusable, oxidation-protected reinforced carbon-carbon (RCC) has been successfully flown on all Shuttle Orbiter...  Read More >>

Annular Solar Eclipse of 10 May 1994

Annular Solar Eclipse of 10 May 1994

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722239473
Format: Paperback
$65.97

An annular eclipse of the Sun will be widely visible from the Western Hemisphere on 10 May 1994. The path of the...  Read More >>

Analysis, Review, and Documentation of the Activation Data from Ldef Material

Analysis, Review, and Documentation of the Activation...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722237660
Format: Paperback
$65.97

Samples removed from Long Duration Exposure Facility (LDEF-1) are being studied at various laboratories to determine...  Read More >>

Analysis of Shell-Type Structures Subjected to Time-Dependent Mechanical and Thermal Loading

Analysis of Shell-Type Structures Subjected to Time-Dependent...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722235826
Format: Paperback
$65.97

The development of a general mathematical model and solution methodologies for analyzing structural response of...  Read More >>

Analysis of Space Environment Damage to Solar Cell Assemblies from Ldef Experiment A0171-Gsfc Test Plate

Analysis of Space Environment Damage to Solar Cell Assemblies...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722236120
Format: Paperback
$65.97

The results of the postflight analysis of the solar cell assemblies from the LDEF (Long Duration Exposure facility)...  Read More >>

Application of a Comprehensive Analytical Model of Rotor Aerodynamics and Dynamics (Camrad) to the McDonnell Douglas Ah-64a Helicopter

Application of a Comprehensive Analytical Model of Rotor...

Author: National Aeronaut Administration (Nasa)
ISBN: 9781722240684
Format: Paperback
$65.97

A model of the AH-64A helicopter was generated in a Comprehensive Analytical Model of Rotorcraft Aerodynamics and...  Read More >>

Sub Categories for
Research & information: general
Latest Reading Guide

April RG 26_2

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List