|
![]() |
|||
|
||||
OverviewThis volume discusses the readiness of the U.S. Department of Energy's (DOE) Waste Isolation Pilot Plant (WIPP) facility near Carlsbad, New Mexico, to serve as a geological repository for transuranic radioactive waste. WIPP is located in a Permian-age bedded salt deposit 658 meters below the surface. The committee has long reviewed DOE's readiness efforts, now aimed at demonstrating compliance with U.S. Environmental Protection Agency regulations. Site characterization studies and performance assessment modeling are among the topics considered in this volume. Table of Contents FRONT MATTER EXECUTIVE SUMMARY 1 INTRODUCTION 2 REGULATORY COMPLIANCE AND REPOSITORY PERFORMANCE 3 SALADO HYDROGEOLOGY, GAS PRESSURE, AND ROOM CLOSURE 4 ENGINEERING TO IMPROVE PREDICTED REPOSITORY PERFORMANCE 5 ACTINIDE SOURCE TERM 6 NON-SALADO HYDROLOGY 7 PERSPECTIVES REFERENCES APPENDIXES A. NATURAL SETTING AND RESOURCES B. THE COMPLEMENTARY CUMULATIVE DISTRIBUTION FUNCTION: THE RISK CURVE C. BRINE INFLOW TO EXCAVATIONS IN THE SALADO D. CREEP BEHAVIOR OF WIPP SALT E. ACTINIDE SOURCE TERM F. REGIONAL HYDROGEOLOGY G. AN OVERVIEW OF WIPP COMPLIANCE ISSUES H. BIOGRAPHICAL SKETCHES OF COMMITTEE MEMBERS I. GLOSSARY J. LIST OF ACRONYMS AND SYMBOLS K. BIBLIOGRAPHY Full Product DetailsAuthor: National Research Council , Division on Earth and Life Studies , Commission on Geosciences, Environment and Resources , Committee on the Waste Isolation Pilot PlantPublisher: National Academies Press Imprint: National Academies Press Dimensions: Width: 21.60cm , Height: 1.20cm , Length: 27.90cm Weight: 0.522kg ISBN: 9780309054911ISBN 10: 0309054915 Pages: 184 Publication Date: 13 December 1996 Audience: Professional and scholarly , Professional & Vocational Format: Paperback Publisher's Status: Active Availability: Out of stock ![]() The supplier is temporarily out of stock of this item. It will be ordered for you on backorder and shipped when it becomes available. Table of Contents1 FRONT MATTER; 2 EXECUTIVE SUMMARY; 3 1 INTRODUCTION; 4 2 REGULATORY COMPLIANCE AND REPOSITORY PERFORMANCE; 5 3 SALADO HYDROGEOLOGY, GAS PRESSURE, AND ROOM CLOSURE; 6 4 ENGINEERING TO IMPROVE PREDICTED REPOSITORY PERFORMANCE; 7 5 ACTINIDE SOURCE TERM; 8 6 NON-SALADO HYDROLOGY; 9 7 PERSPECTIVES; 10 REFERENCES; 11 APPENDIXES; 12 A. NATURAL SETTING AND RESOURCES; 13 B. THE COMPLEMENTARY CUMULATIVE DISTRIBUTION FUNCTION: THE RISK CURVE; 14 C. BRINE INFLOW TO EXCAVATIONS IN THE SALADO; 15 D. CREEP BEHAVIOR OF WIPP SALT; 16 E. ACTINIDE SOURCE TERM; 17 F. REGIONAL HYDROGEOLOGY; 18 G. AN OVERVIEW OF WIPP COMPLIANCE ISSUES; 19 H. BIOGRAPHICAL SKETCHES OF COMMITTEE MEMBERS; 20 I. GLOSSARY; 21 J. LIST OF ACRONYMS AND SYMBOLS; 22 K. BIBLIOGRAPHYReviewsAuthor InformationCommittee on the Waste Isolation Pilot Plant, National Research Council Tab Content 6Author Website:Countries AvailableAll regions |