Symposium on the Theory of Scheduling and Its Applications

Author:   S. E. Elmaghraby
Publisher:   Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
Edition:   Softcover reprint of the original 1st ed. 1973
Volume:   86
ISBN:  

9783540064374


Pages:   440
Publication Date:   14 November 1973
Format:   Paperback
Availability:   In Print   Availability explained
This item will be ordered in for you from one of our suppliers. Upon receipt, we will promptly dispatch it out to you. For in store availability, please contact us.

Our Price $290.37 Quantity:  
Add to Cart

Share |

Symposium on the Theory of Scheduling and Its Applications


Overview

The theory of scheduling is receiving increased emphasis in research and practice for at least three good reasons. F~~t, the management of large scale projects resolves itself, in the final analysis, into problems of scheduling interacting activities subject to limited resources. Second, a great deal of ""fat"" that used to exist in the past in production, distribution, and service systems is eliminated, thanks to tighter managerial controls in information systems, in financial management, in logistics, and in many other facets of industrial enterprises and military installations. Tighter scheduling methods are therefore called for. Thi~d, the study of scheduling problems involves the study of combina­ torial problems and optimization over discrete spaces which represent a radical, and interesting, departure from classical mathematics. This area of study has attracted a good number of distinguished researchers, engineers as well as mathematicians. There is a serious attempt to apply known number theory, and perhaps develop new theory, that would cope with the new problems. The computer enters the picture in novel and ingenious ways, which has not been possible before; etc. To those workinQ in the area, whether in theory or in practice, progress proceeds at an exhilarating pace, with new mathematical structures and computational approaches being continuously introduced to model and solve the problems in novel, and oftentimes ingenious ways.

Full Product Details

Author:   S. E. Elmaghraby
Publisher:   Springer-Verlag Berlin and Heidelberg GmbH & Co. KG
Imprint:   Springer-Verlag Berlin and Heidelberg GmbH & Co. K
Edition:   Softcover reprint of the original 1st ed. 1973
Volume:   86
Dimensions:   Width: 17.80cm , Height: 2.30cm , Length: 25.40cm
Weight:   0.844kg
ISBN:  

9783540064374


ISBN 10:   3540064370
Pages:   440
Publication Date:   14 November 1973
Audience:   Professional and scholarly ,  Professional & Vocational
Format:   Paperback
Publisher's Status:   Active
Availability:   In Print   Availability explained
This item will be ordered in for you from one of our suppliers. Upon receipt, we will promptly dispatch it out to you. For in store availability, please contact us.

Table of Contents

I. Survey Papers.- “A Critique of Project Planning with Constrained Resources”.- “Sequencing Research and the Industrial Scheduling Problem”.- II. Applications.- “The Engine Scheduling Problem in a Railway Network” — Abstract.- “Detail Scheduling Models and Systems”.- “A Naval Air Rework Facility Scheduling Problem”.- “Some Scheduling Applications in Chemical Industry”.- “A Solution to a Special Class of Flow Shop Scheduling Problem”.- “Two Recent Developments in Scheduling Applications”.- “Toward a Man-Machine Interactive System for Project Scheduling”.- III. Theory.- “Efficient Solution Procedures for Certain Scheduling and Sequencing Problems”.- “On the Set Representation and the Set Covering Problem”.- Discussion of Murty’s paper.- “Selected Comments Concerning Optimization Techniques for Functions of Permutations”.- Discussion of Rau’s paper.- IV. Models of Processes.- “An Out-of-Kilter Approach for Machine Sequencing Problems”.- “Trading Rules for a Decentralized Exchange Economy”.- “Scheduling with Early Start and Due Date Constraints” — Abstract.- “The Scheduling of a Multi-Product Facility”.- “The Two-Machine Job Shop with Exponential Processing Times”.- “Optimal Solutions of Scheduling Problems Using Lagrange Multipliers, Part II”.- Discussion of Fisher’s paper.- “On Project Cost-Duration Analysis Problem with Quadratic and Convex Cost Functions”.- “A Problem in Single Facility Scheduling with Sequence Independent Change-Over Costs”.- “Random Patrol Scheduling Under Operational Constraints”.- “Interaction Between Aggregate and Detailed Scheduling in a Job Shop” — Abstract.- “An Extension of Moore’s Due Date Algorithm”.- “Solving Scheduling Problems byApplying Cost Operators to Assignment Models”.- “Some Extensions of Akers-Friedman Production Scheduling Problem”.- “On a Feasibility Approach to Optimal Schedules”.

Reviews

Author Information

Tab Content 6

Author Website:  

Countries Available

All regions
Latest Reading Guide

NOV RG 20252

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List