OverviewFor the first time since the design of the first nuclear submarine, the U.S. Navy has no nuclear submarine design program under way, which raises the possibility that design capability could be lost. Such a loss could result in higher costs and delays when the next submarine design is undertaken, as well as risks to system performance and safety. The authors estimate and compare the costs and delays of letting design capability erode vs. those of alternative means of managing the workload and workforce over the gap in design demand and beyond. The authors recommend that the Navy consider stretching out the design of the next submarine class and starting it early, or, if that seems too risky, sustaining design resources at the shipyards, their vendors, and in the Navy itself that exceed those supported by the demand. Full Product DetailsAuthor: John F Schank , Mark V Arena , Paul DeLuca , Jessie RiposoPublisher: RAND Corporation Imprint: RAND Corporation ISBN: 9781281181169ISBN 10: 1281181161 Pages: 234 Publication Date: 14 June 2007 Audience: General/trade , General Format: Undefined Publisher's Status: Active Availability: Available To Order ![]() We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |