Study on Barriers of Implementation of Building Information Modeling in Facilities Management

Author:   Zhaoqiang He ,  贺照强
Publisher:   Open Dissertation Press
ISBN:  

9781361006191


Publication Date:   26 January 2017
Format:   Paperback
Availability:   Temporarily unavailable   Availability explained
The supplier advises that this item is temporarily unavailable. It will be ordered for you and placed on backorder. Once it does come back in stock, we will ship it out to you.

Our Price $129.36 Quantity:  
Add to Cart

Share |

Study on Barriers of Implementation of Building Information Modeling in Facilities Management


Overview

This dissertation, Study on Barriers of Implementation of Building Information Modeling in Facilities Management by Zhaoqiang, He, 贺照强, was obtained from The University of Hong Kong (Pokfulam, Hong Kong) and is being sold pursuant to Creative Commons: Attribution 3.0 Hong Kong License. The content of this dissertation has not been altered in any way. We have altered the formatting in order to facilitate the ease of printing and reading of the dissertation. All rights not granted by the above license are retained by the author. Abstract: Innovation implementation within an organization has always been associated with barriers from all aspects. As a key innovation in the building industry, Building Information Modeling (BIM) has been adopted rapidly in the design and construction process. Facilities management (FM) which contributed far more values than design and construction however did not seems to catch up with this trend. High cost, poor technology and other factors inherent within organizations were mostly mentioned in research papers and industry to be the key obstacles. This paper aimed to explore and identify the key organizational barriers of the implementation process of BIM in FM. Three case studies on large FM organizations in Hong Kong were reported through in-depth interviews. Two FM software providers were also interviewed to have a comprehensive understanding of BIM in FM interfacing technology. Before the data collection process, two theoretical models were built to guide the data collection and analysis process. The first model was based on the information flow during the BIM in FM implementation process whilst the second model was about the required conditions for such process. FM managers from three leading organizations in BIM implementation in Hong Kong were interviewed. Some published documents from the targeted organizations were reviewed to facilitate the research findings. Soft system analysis was adopted to analyze the barriers which impeded the implementation of BIM in FM. A cross case study was also conducted to strengthen the findings from the three case studies. Two overseas software providers with successful BIM in FM experiences were also interviewed. The technology of BIM in FM is found to be ready for importing the construction stage information to FM software packages. The additional functions based on BIM in FM, however, are still not readily available in the market. The fragmentation between the project and facilities management teams was found to be the most significant barriers for BIM implementation. To overcome such barriers, organizations may consider establishing a coordination platform between the project management team and FM team. It could be the most efficient way when the fragmented organizational structure was not possible to be changed in a short time. A company-wide BIM standard would also be useful to help during the coordination process. DOI: 10.5353/th_b5108693 Subjects: Facility managementBuilding information modeling

Full Product Details

Author:   Zhaoqiang He ,  贺照强
Publisher:   Open Dissertation Press
Imprint:   Open Dissertation Press
Dimensions:   Width: 21.60cm , Height: 0.50cm , Length: 27.90cm
Weight:   0.222kg
ISBN:  

9781361006191


ISBN 10:   1361006196
Publication Date:   26 January 2017
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   Temporarily unavailable   Availability explained
The supplier advises that this item is temporarily unavailable. It will be ordered for you and placed on backorder. Once it does come back in stock, we will ship it out to you.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Countries Available

All regions
Latest Reading Guide

April RG 26_2

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List