|
![]() |
|||
|
||||
OverviewHow do you convey the idea of a multi billion dollar program from concept to reality? The Second Drop provides some detailed explanations of program elements which were not included in the earlier Central Lakes Region Solution. The initial steps needed to begin the implementation of the Regional Plan are demonstrated (Politics not included - though implied). Included is an economic overview and benefits of the application of Gravel Mining and Pumped Storage Hydroelectric Power Production to the Regional Plan. Expansion of recreational opportunities and the scale and type of infrastructure changes are discussed. Full Product DetailsAuthor: Thomas S Baron Pe/CePublisher: Createspace Independent Publishing Platform Imprint: Createspace Independent Publishing Platform Dimensions: Width: 14.00cm , Height: 1.20cm , Length: 21.60cm Weight: 0.313kg ISBN: 9781519262745ISBN 10: 1519262744 Pages: 190 Publication Date: 20 June 2016 Audience: General/trade , General Format: Paperback Publisher's Status: Active Availability: Available To Order ![]() We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately. Table of ContentsReviewsAuthor Information"My civil engineering career began when, as a 10-year-old, I asked my Dad 'Could a Reservoir like Quabbin could be built in our valley (Quaboag)?'. He neither said 'yes' or 'no' but rather ""I don't know -What would you need to know to find out?"" My studies at WPI were followed by 4 years as an officer in the US Army Corps of Engineers. Assignments included highway construction in Thailand, Special Assistant to the Post Engineer, Ft. Benning GA, and Company Commander. My Boston Metro Water system career spanned 26 years, achieving Director of Operations in charge of service to 3 million people." Tab Content 6Author Website:Countries AvailableAll regions |