|
|
|||
|
||||
OverviewSocial and Environmental Impact Assessment Turkmenistan Afghanistan Line Full Product DetailsAuthor: Agha Humayun AminPublisher: Createspace Independent Publishing Platform Imprint: Createspace Independent Publishing Platform Dimensions: Width: 15.20cm , Height: 1.90cm , Length: 22.90cm Weight: 0.390kg ISBN: 9781500922023ISBN 10: 1500922021 Pages: 290 Publication Date: 23 August 2014 Audience: General/trade , General Format: Paperback Publisher's Status: Active Availability: Available To Order We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately. Table of ContentsReviewsAuthor InformationAbout the Author Successfully carried out CASA 1000 Study as CEO of a company, sub contractor wit SNC Lavalin Canada in January-September 2008. Contact address- transoxianac@gmail.com Partner with SOFRECO France in Afghanistan Natural Gas Development Organising and managing Supply of crush and aggregate to Aydeniz Insaat Turkey constructing military portion of Kabul Airport July 2006 -supply of cold mix to Aydeniz Insaat for Kabul Airport. Supply of Bitumin Grade 60-70 to Aydeniz at Kabul Airport. Consultant with NATO client for IED survey in Afghanistan from May 2006 to October 2006. Work dealt with IED logistics, how to interdict IED logistics and anti IED countermeasures at the strategic, operational and tactical level. Survey of 22 Km Road from Nad I Ali to Camp Bastion with Pro Sima Lebanon. Pre bid survey for USACE bid for Pro Sima Lebanon in a highly dangerous insurgent dominated area. Realignment of CASA 1000 at Salang Pass Study for SNC Lavalin Canada -December 2009 to February 2011-This was a World Bank Project. Carried out World Bank High Level Desk Top study for Uzbekistan Afghanistan Pakistan Electric Transmission line as sub contractor of SNC Lavalin Canada. Carried out study of electric line from Uzbekistan to Chitral Pakistan for SNC Lavalin Canada.The study was discontinued in the middle when SNC Lavalin discovered that there was no compatible grid station in Chitral. Provided System Planning Specialist, Power Transmission Expert); and Social Safeguard Expert to provide certain consultancy services to Fichtner Germany as sub contractor of UNICON United Kingdom for Asian Development Bank TA No. 7637: Power Sector Master Plan in Afghanistan Staffing partner with Unicon UK which was sub contractor of Fichtner Germany for Asian Development Bank project TA No 7637. TA 7853 (REG) Afghanistan Turkmenistan Regional Power Interconnection Project Carried out alignment social Impact Assessment, resettlement and environmental survey now for Turkmenistan Afghanistan Electric Transmission line. An ADB project where TRANSOXIANA Was sub consultant with FICHTNER Germany in the ASIAN DEVELOPMENT BANK TA 7853 (REG) Afghanistan Turkmenistan Regional Power Interconnection Project. Tab Content 6Author Website:Countries AvailableAll regions |
||||