Public Plug-In Vehicle Charging Infrastructure Project Update: Reconnect California Program

Author:   Will Barret ,  Inc Clippercreek ,  California Energy Commission
Publisher:   Independently Published
ISBN:  

9798687787215


Pages:   38
Publication Date:   19 September 2020
Format:   Paperback
Availability:   Temporarily unavailable   Availability explained
The supplier advises that this item is temporarily unavailable. It will be ordered for you and placed on backorder. Once it does come back in stock, we will ship it out to you.

Our Price $26.37 Quantity:  
Add to Cart

Share |

Public Plug-In Vehicle Charging Infrastructure Project Update: Reconnect California Program


Add your own review!

Overview

This is a low cost print edition of a government publication. The purpose of ClipperCreek's Reconnect California Program was to deploy compliant electricvehicle charging stations according to the society of automotive engineers throughoutCalifornia. This Final Project Report assesses the success of the program, estimatesgreenhouse gas reductions, and estimates the increased potential for plug-in vehicleownership due to the expanded network of public charging infrastructure.This $3.5 million project was funded by the California Energy Commission and ClipperCreek toupdate public plug-in vehicle charging infrastructure throughout California without leaving preexisting plug-in vehicle drivers stranded. Over the course of the project, ClipperCreek installed762 Level 2 charging stations and 37 Level 1 charging ports at 313 sites throughout California.ClipperCreek worked with stakeholders, utilities, and clean cities collations to identify theoptimal sites to locate the charging infrastructure. The majority of the infrastructure updatedthrough this program was at legacy sites, meaning that the sites had pre-existing, but out ofdate, plug-in vehicle charging infrastructure. This pre-existing infrastructure made the upgradeinstallation a straight forward process for the legacy sites. During planning, ClipperCreekdiscovered that many legacy site hosts were unwilling to accept the new charging equipmentat their sites; this was one factor that caused the program time frame to be longer thanoriginally planned and for the program to expand to some new sites (sites that did notpreviously have complete charging infrastructure).Overall, the program was successful; ClipperCreek installed more equipment than originallyplanned while staying within budget. Key recommendations include: 1) Have a set list ofwhere installations will take place (agreeable site hosts) with a list of backup sites, 2) Plan abudget for site outreach, education, and project coordination.

Full Product Details

Author:   Will Barret ,  Inc Clippercreek ,  California Energy Commission
Publisher:   Independently Published
Imprint:   Independently Published
Dimensions:   Width: 21.60cm , Height: 0.20cm , Length: 28.00cm
Weight:   0.113kg
ISBN:  

9798687787215


Pages:   38
Publication Date:   19 September 2020
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   Temporarily unavailable   Availability explained
The supplier advises that this item is temporarily unavailable. It will be ordered for you and placed on backorder. Once it does come back in stock, we will ship it out to you.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Customer Reviews

Recent Reviews

No review item found!

Add your own review!

Countries Available

All regions
Latest Reading Guide

MRG2025CC

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List