|
![]() |
|||
|
||||
OverviewThe safety in all stages of operation of a NPP is paramount, and all requirements have to be met to obtain and to extend/renew the operating license. A PLiM programme is essential to achieve the goal of long term safe, economic and reliable operation. Some utilities already have advanced PLiM programmes while others are establishing theirs. The PLiM objective is to identify all relevant factors and requirements for the overall plant life cycle, including decommissioning and return of the site to a 'green field'. The optimization of these requirements would enable a minimum period for the return of investment and a maximization of the revenue from the sale of the produced electricity. Recognizing the importance of safe, continued operation, and in response to the requests of Member States, the 2nd Plant Life Management Symposium was organized with the hosting of the China Atomic Energy Authority and China Nuclear National Corporation from 15 to 18 October 2008 in Shanghai, China. It attracted about 300 participants from 35 Member States and 3 international organizations. 175 papers were presented in keynotes, oral and poster sessions. Full Product DetailsAuthor: IAEAPublisher: IAEA Imprint: IAEA ISBN: 9789201605085ISBN 10: 9201605080 Pages: 277 Publication Date: 30 June 2008 Audience: Professional and scholarly , Professional & Vocational Format: CD-ROM Publisher's Status: Active Availability: Out of stock ![]() The supplier is temporarily out of stock of this item. It will be ordered for you on backorder and shipped when it becomes available. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |