Improving Flow: Collected Practices and Cases

Author:   Productivity Press
Publisher:   Taylor & Francis Inc
ISBN:  

9781563273322


Pages:   154
Publication Date:   15 January 2006
Format:   Paperback
Availability:   In Print   Availability explained
This item will be ordered in for you from one of our suppliers. Upon receipt, we will promptly dispatch it out to you. For in store availability, please contact us.

Our Price $46.99 Quantity:  
Add to Cart

Share |

Improving Flow: Collected Practices and Cases


Add your own review!

Overview

Flow is a fundamental concept of lean manufacturing, and its improvement is a challenge to many organizations. After mastering basic visual tools, managers must concentrate on increasing flow. This work provides shopfloor and other lean professionals with what they need to know about how other companies are implementing and sustaining continuous flow improvement. Improving Flow: Collected Practices and Cases provides a variety of case studies taken from articles previously published in the newsletter Lean Manufacturer Advisor. The book demonstrates how to move products and services to the customer quicker while eliminating waste and improving profits.

Full Product Details

Author:   Productivity Press
Publisher:   Taylor & Francis Inc
Imprint:   Productivity Press
Dimensions:   Width: 15.20cm , Height: 0.90cm , Length: 22.90cm
Weight:   0.280kg
ISBN:  

9781563273322


ISBN 10:   1563273322
Pages:   154
Publication Date:   15 January 2006
Audience:   Professional and scholarly ,  Professional & Vocational
Format:   Paperback
Publisher's Status:   Active
Availability:   In Print   Availability explained
This item will be ordered in for you from one of our suppliers. Upon receipt, we will promptly dispatch it out to you. For in store availability, please contact us.

Table of Contents

Part I: Setting Up Cells Chapter 1: De-Coupling and Coupling: Keys to Better Cell Design Chapter 2: Cell Staffing Options (by Vulcan Electric) Chapter 3: Job Shop Breaks Traditional Rules with 1-Piece Flow Cells Chapter 4: Cells on Wheels Give Company Ability to Shift Course Quickly Chapter 5: Time to Take a Radical Step Forward Chapter 6: Equipment Designed through 3P Makes a Small Startup Viable Part II: Improving Flow Chapter 7: Takt Time Can Configure a Cell Chapter 8: You May Need Two Takt Times Chapter 9: Reducing Scrap Paves the Way for a Big Boost in Capacity Chapter 10: Building Out of Sequence is Expensive Chapter 11: Ford Sees Its Future in Flexibility Chapter 12: Building a Better Body Shop Part III: Smoothing Production Chapter 13: Heijunka Can Help Eliminate Production Peaks and Valleys Chapter 14: Work Speeds Up as Operators Move Chapter 15: Times, Not Products, Set Schedule Chapter 16: 12-Hour Shifts Help Tire Plant Achieve Its Lean Objectives Part IV: Shortening Changeovers Chapter 17: What Is in Your Changeover? Probably More Than You Need Chapter 18: SMED Doubles Parts Output for Metal Stamping Company Chapter 19: Calculating Changeover Costs Reveals Potential for Savings Chapter 20: Sequencing Products Leads to Least Changeover Time Chapter 21: Success with Cardboard Duct Tape

Reviews

Author Information

Productivity Development Team

Tab Content 6

Author Website:  

Customer Reviews

Recent Reviews

No review item found!

Add your own review!

Countries Available

All regions
Latest Reading Guide

MRG2025CC

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List