|
![]() |
|||
|
||||
OverviewPlease note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. George Galatis was a senior nuclear engineer and whistleblower who reported safety problems at the Millstone 1 Nuclear Power Plant, relating to reactor refueling procedures, in 1996. The unsafe procedures meant that spent fuel rod pools at Unit 1 had the potential to boil, possibly releasing radioactive steam throughout the plant. Every 18 months the Millstone 1 nuclear reactor was shut down so the fuel rods that make up its core could be replaced; the old rods, radioactive and burning hot, were moved into a 40-feet-deep body of water called the spent-fuel pool. Full Product DetailsAuthor: Pollux Variste KjeldPublisher: Chrono Press Imprint: Chrono Press Dimensions: Width: 15.20cm , Height: 0.50cm , Length: 22.90cm Weight: 0.136kg ISBN: 9786200151940ISBN 10: 6200151946 Pages: 84 Publication Date: 23 December 2011 Audience: General/trade , General Format: Paperback Publisher's Status: Active Availability: Not yet available ![]() This item is yet to be released. You can pre-order this item and we will dispatch it to you upon its release. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |