Earned Value Management System Manual: EVMS Systems Manual

Author:   Dr Sean Thomas Regan ,  Dr Sean Thomas Regan
Publisher:   Lgm International, LLC
ISBN:  

9780615676210


Pages:   162
Publication Date:   05 August 2011
Format:   Paperback
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $238.87 Quantity:  
Add to Cart

Share |

Earned Value Management System Manual: EVMS Systems Manual


Add your own review!

Overview

The LGM International Earned Value Management System (EVMS) Manual was developed for implementation on Commercial and Government Projects for Domestic and International Projects. The procedures and process are based on best international practices and follow ISO, ANSI 748, GAAP, and IFRS systems to allow a project that does not have a system to implement a process that will be able to meet Internatl and External Auditing Practices.

Full Product Details

Author:   Dr Sean Thomas Regan ,  Dr Sean Thomas Regan
Publisher:   Lgm International, LLC
Imprint:   Lgm International, LLC
Dimensions:   Width: 21.60cm , Height: 1.10cm , Length: 27.90cm
Weight:   0.390kg
ISBN:  

9780615676210


ISBN 10:   0615676219
Pages:   162
Publication Date:   05 August 2011
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

Dr. Regan has over 30 years experience in Project Management and Project Controls. Author is a Certified Cost Engineer, Certified Estimating Professional, and Quantity Surveyor. Author is a member Royal Institute of Charter Surveyors (RICS) and Association Advancement Cost Engineering International (AACEI). Having working in US and Internationally for more then 28 years he has implemented EVM and Project Management on 5 Continents and over $16 billion of EPCM work in Government and Commercial projects. The EVM system as developed is based on years of working in multiple companies and systems and has been done in multiple languages and skill sets. Dr. Regan has worked for years for the Education Board of AACE advancing the skills and knowledge of Cost Engineering as well as establishing training programs in internal auditing and external audits such as DCAA, DCMA and ISO.

Tab Content 6

Author Website:  

Customer Reviews

Recent Reviews

No review item found!

Add your own review!

Countries Available

All regions
Latest Reading Guide

MRG2025CC

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List