Earned Value Management Schedule Performance Indicators in Units of Time

Author:   Scott E Smith
Publisher:   Hutson Street Press
ISBN:  

9781025140001


Pages:   74
Publication Date:   22 May 2025
Format:   Paperback
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $42.11 Quantity:  
Add to Cart

Share |

Earned Value Management Schedule Performance Indicators in Units of Time


Overview

Earned Value Management (EVM) is a powerful technique assisting decision-makers in understanding the status of a project. The schedule performance measures have been viewed by some as lacking value to the decision-maker. This research investigated the performance characteristics of the EVM schedule measures and a new method for measuring schedule performance, Earned Schedule (ES). The evaluation of EVM and ES schedule measures within the Defense Acquisition Executive Summary (DAES) database revealed a statistical difference between the schedule measures, but did show they were correlated. THe DAES was found to include only the most current planned value at time of data entry, not the original planned value schedule. The result was that both EVM and ES schedule performance measures indicated perfect schedule completion at the end of each contract. THis research was able to show that ES theory can accurately portray schedule performance under certain conditions. While holding the planned value schedule constant may not be realistic in every instance, the ES theory may still be of value of is worth of further research. This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work. This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work. As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant.

Full Product Details

Author:   Scott E Smith
Publisher:   Hutson Street Press
Imprint:   Hutson Street Press
Dimensions:   Width: 15.60cm , Height: 0.40cm , Length: 23.40cm
Weight:   0.118kg
ISBN:  

9781025140001


ISBN 10:   1025140001
Pages:   74
Publication Date:   22 May 2025
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Countries Available

All regions
Latest Reading Guide

NOV RG 20252

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List