Early Public Involvement in the European Grid Extension

Author:   Natalia Geng
Publisher:   Grin Publishing
ISBN:  

9783668482258


Pages:   54
Publication Date:   13 July 2017
Format:   Paperback
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $76.33 Quantity:  
Add to Cart

Share |

Early Public Involvement in the European Grid Extension


Overview

Seminar paper from the year 2014 in the subject Environmental Sciences, grade: 1,0 - 1,5 (hervorragend), University of Hagen, language: English, abstract: This paper includes analyses on the current status of public participation activities in the selected European countries. The analysis provides information about the existing legal requirements, actual activities and used forms of public involvement during the need determination phase of the high voltage power grid. The paper provides answers to the following questions: Is public participation in the need determination required by the national law of the respective countries? What forms of participation do actually take place in the different phases of the need determination? Which actors can get involved? Is there a transparent documentation of the received input and its reaction in the decisions? Need determination is the very first step of the grid extension and modification process, followed by the spatial planning and permitting. Need determination requires comprehensive analyses of the existing power grid data and possible future developments of all factors affecting the need for electricity transmission. Extensive grid and market simulations incorporating expected future developments have to be carried out in order to identify potential capacity problems and, finally identify possible transmission solutions. Since future long and medium term projections may significantly change, depending on the current developments, the assumptions and modelling has to be repeated at reasonable intervals. Need determination thus represents an iterative planning process. It is in the responsibility of Transmission System Operators and is often reviewed by National Regulators, who monitor the work of TSOs on an ongoing basis. This is due to the fact that TSOs usually represent natural monopolies and thus require controls to ensure cost efficiency and non-discriminant access to the network to all actors. The identified need

Full Product Details

Author:   Natalia Geng
Publisher:   Grin Publishing
Imprint:   Grin Publishing
Dimensions:   Width: 14.80cm , Height: 0.30cm , Length: 21.00cm
Weight:   0.082kg
ISBN:  

9783668482258


ISBN 10:   366848225
Pages:   54
Publication Date:   13 July 2017
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Countries Available

All regions
Latest Reading Guide

NOV RG 20252

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List