OverviewFrom the Book - Preface: This manual has been compiled to provide time frames, labor crews and equipment spreads to assist the estimator in capsulizing an estimate for the installation of cross-country pipelines, marshland pipelines, nearshore and surf zone pipelines, submerged pipelines, wharfs, jetties, dock facilities, single-point morring terminals, offshore drilling and production platforms and equipment and appurtenances installed thereon. The time frames and labor and equipment spreads which appear throughout this manual are the result of many time and method studies conducted under varied conditions and at locations throughout the world; these time frames and labor and equipment spreads reflect a complete, unbiased view of all operations involved. When one is engaged in compiling an estimate from any information furnished by others, as is the case with this manual, he should view it in an objective light, giving due consideration to the nature of the project at hand and evaluating all items that may affect the productivity of labor and all other elements involved. Full Product DetailsAuthor: John S. Page , John S. PagePublisher: Elsevier Science & Technology Imprint: Gulf Publishing Co Dimensions: Width: 15.20cm , Height: 1.70cm , Length: 23.50cm Weight: 0.560kg ISBN: 9780872011571ISBN 10: 0872011577 Pages: 336 Publication Date: 01 January 1977 Audience: Professional and scholarly , Professional & Vocational Format: Paperback Publisher's Status: Out of Print Availability: Awaiting stock ![]() Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |