|
![]() |
|||
|
||||
OverviewFull Product DetailsAuthor: Ryszard Bartnik , Zbigniew BurynPublisher: Springer London Ltd Imprint: Springer London Ltd Dimensions: Width: 15.50cm , Height: 1.10cm , Length: 23.50cm Weight: 0.454kg ISBN: 9780857298553ISBN 10: 0857298550 Pages: 154 Publication Date: 28 July 2011 Audience: Professional and scholarly , Professional & Vocational Format: Hardback Publisher's Status: Active Availability: Awaiting stock ![]() The supplier is currently out of stock of this item. It will be ordered for you and placed on backorder. Once it does come back in stock, we will ship it out for you. Table of Contents1. Introduction.- 2. Selection of Optimal Heating Structures for Modernization of Coal-Fired Power Stations to Cogeneration.- 3. Mathematical Model of a Power Unit with Rated Capacity of 370 MW After Its Modernization to Cogeneration and Combined-Cycle.- 4. Algorithm for the Calculation of an Optimum Structure of Heat Exchangers for the Modernization of a 370 MW Power Unit to Combined Heat and Power Cycle.- 5. Testing Calculations of the Mathematical Model of a Power Unit.- 6. Thermodynamic Analysis of a Combined Heat and Power Unit Using Extractions A2, A3 and Crossoverpipe IP-LP for Heater Supply.- 7. Economic Efficiency of a Power Unit Adapted to Cogeneration.- 8. Technical and Economical Effectiveness of Modernization 370 MW Power Unit Repowered by Gas Turbine with Their Modernization to Cogeneration.- 9. Technical and Economical Effectiveness of 370 MW Power Unit Repowered by Gas Turbine in Parallel System.- 10. Summary and Final Conclusions.ReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |