|
![]() |
|||
|
||||
OverviewPlease note that the content of this book primarily consists of articles available from Wikipedia or other free sources online. Anglesey Aluminium Metal Ltd, shut down on 30 September 2009, was a joint venture between Rio Tinto Group and Kaiser Aluminium. Its aluminium smelter, located on the outskirts of Holyhead, was one of the largest employers in North Wales, with 540 staff members, and began to produce aluminium in 1971. Until recently it produced up to 142,000 tonnes of aluminium every year and was the biggest single user of electricity (255 MW) in the United Kingdom. Alumina and coke shipped from Jamaica and Australia would berth at the company's private jetty in Holyhead harbour. This jetty is linked by a series of conveyor belts passing through tunnels to the plant. A spur rail link from the main Holyhead to London rail line runs into the plant and was used for both receipt of raw materials and despatch of aluminium. The plant was powered from the National Grid and received most of its electricity from Wylfa nuclear power station 15 miles away. AA was used as a base load for Wylfa and saved the grid the cost of keeping a power station on standby. The power contract terminated in 2009, and the aluminium smelting operation was shut down as no new contract was negotiated. Full Product DetailsAuthor: Zheng CirinoPublisher: CIV Imprint: CIV Dimensions: Width: 15.20cm , Height: 0.40cm , Length: 22.90cm Weight: 0.113kg ISBN: 9786137437728ISBN 10: 6137437728 Pages: 68 Publication Date: 15 October 2011 Audience: General/trade , General Format: Paperback Publisher's Status: Unknown Availability: Not yet available ![]() This item is yet to be released. You can pre-order this item and we will dispatch it to you upon its release. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |