Analysis of Ssn 688 Class Submarine Maintenance Delays - Study of Pearl Harbor Naval Shipyard Work on Nuclear-Powered Attack Submarines, Impact of Decrease in Overall Operational Availability

Author:   U S Military ,  Department of Defense (Dod) ,  R Leon Lary IV
Publisher:   Independently Published
ISBN:  

9781718049550


Pages:   92
Publication Date:   04 August 2018
Format:   Paperback
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $26.37 Quantity:  
Add to Cart

Share |

Analysis of Ssn 688 Class Submarine Maintenance Delays - Study of Pearl Harbor Naval Shipyard Work on Nuclear-Powered Attack Submarines, Impact of Decrease in Overall Operational Availability


Add your own review!

Overview

The combination of negative real budget growth and unchanged operational use has stressed the resources of the United States Navy, resulting in an annual average over-budget execution of $0.77 billion per year in Navy-wide ship depot maintenance since FY2010. The Navy's active ship maintenance budget only supports 70 percent of the ship maintenance projected in FY2017; a significant portion of over-budget execution and delays has occurred with submarine availabilities. Delays to a submarine's return to the fleet results in a decrease of the overall operational availability (Ao) of already diminishing submarine force levels. In this thesis, data collected from Pearl Harbor Naval Shipyard (PHNSY) is analyzed to investigate possible factors impacting the ability of maintenance activities to complete SSN 688-class submarine maintenance availabilities as scheduled. The analysis illustrates a systematic underestimation of availability duration due to the use of outdated historically based estimates following a significant shift in maintenance strategy in 2012. Additionally, the analysis shows a significant increasing trend in the average number of man-days required to complete a job. This thesis provides a narrowed focus for future studies attempting to determine the cause of this trend. Finally, this thesis proposes a solution to the systematic underestimation of availability durations by illustrating the inherent error in the current equation and providing a notional equation to remove that error. I. INTRODUCTION * A. PURPOSE * 1. Problem Statement * 2. Research Questions * B. BENEFIT OF STUDY * 1. Attack Submarine Inventory Shortfall * 2. Resource-Constrained Environment * C. SCOPE OF THESIS * II. BACKGROUND * A. SUBMARINE MAINTENANCE PRACTICES * 1. Levels of Maintenance * 2. Submarine Maintenance Strategy * 3. FRP and I-Level Availabilities * 4. Maintenance Life Cycle Changes * B. TECHNICAL FOUNDATION PAPERS * 1. TFP Rev B Duration Calculation * 2. TFP Duration Summary * III. DATA AND KEY ASSUMPTIONS * A. DATA COLLECTION * 1. I-Level Availability Data Collection * 2. D-Level Availability Data Collection * B. DATA NORMALIZATION * 1. Normalization for Content * 2. Normalization for Quantity * 3. Normalization for Inflation * C. KEY ASSUMPTIONS * 1. Statistic Relevance over Time * 2. New Work Causes Late Days * IV. INTERMEDIATE LEVEL MAINTENANCE ANALYSIS * A. PROBLEM VERIFICATION * 1. Cost * 2. Schedule * 3. Performance * 4. Summary * B. KEY INDEPENDENT FACTORS * 1. Schedule * 2. Performance * 3. Summary * V. DEPOT LEVEL ANALYSIS * A. SCHEDULE AND PERFORMANCE TRENDS * 1. Performance * 2. Schedule * B. NOTIONAL DURATION APPLICATION * VI. CONCLUSION * A. FINDINGS * B. FUTURE STUDIES * 1. Component Reliability * 2. Workforce Experience * 3. I & D Level Funding * C. RECOMMENDATIONS

Full Product Details

Author:   U S Military ,  Department of Defense (Dod) ,  R Leon Lary IV
Publisher:   Independently Published
Imprint:   Independently Published
Dimensions:   Width: 21.60cm , Height: 0.50cm , Length: 27.90cm
Weight:   0.236kg
ISBN:  

9781718049550


ISBN 10:   1718049552
Pages:   92
Publication Date:   04 August 2018
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Customer Reviews

Recent Reviews

No review item found!

Add your own review!

Countries Available

All regions
Latest Reading Guide

MRG2025CC

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List