OverviewIn December 1996, the Cost/Schedule Control Systems Criteria (C/SCSC) was officially replaced by the Earned Value Management Systems (EVMS) criteria. The switch to EVMS, coupled with current acquisition reform changes, have left many wondering what the effects of these changes will be. This thesis defines the costs and benefits of the old C/SCSC, and then compares them. Additionally, this thesis discusses the changes accompanying the switch to EVMS and the effect on the costs and benefits.The marginal costs of C/SCSC are defined as the difference between the costs of a C/SCSC-compliant system and a contractors 'normal' management control system. This work has been selected by scholars as being culturally important, and is part of the knowledge base of civilization as we know it. This work was reproduced from the original artifact, and remains as true to the original work as possible. Therefore, you will see the original copyright references, library stamps (as most of these works have been housed in our most important libraries around the world), and other notations in the work. This work is in the public domain in the United States of America, and possibly other nations. Within the United States, you may freely copy and distribute this work, as no entity (individual or corporate) has a copyright on the body of the work. As a reproduction of a historical artifact, this work may contain missing or blurred pages, poor pictures, errant marks, etc. Scholars believe, and we concur, that this work is important enough to be preserved, reproduced, and made generally available to the public. We appreciate your support of the preservation process, and thank you for being an important part of keeping this knowledge alive and relevant. Full Product DetailsAuthor: John R ColePublisher: Hutson Street Press Imprint: Hutson Street Press Dimensions: Width: 15.60cm , Height: 1.00cm , Length: 23.40cm Weight: 0.358kg ISBN: 9781025089904ISBN 10: 1025089901 Pages: 128 Publication Date: 22 May 2025 Audience: General/trade , General Format: Hardback Publisher's Status: Active Availability: Available To Order We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately. Table of ContentsReviewsAuthor InformationTab Content 6Author Website:Countries AvailableAll regions |
||||