A Computer Code for Solving Integer Programming Problems with Variable Resource Levels (Classic Reprint)

Author:   Nancy P Kaplan
Publisher:   Forgotten Books
ISBN:  

9781334017674


Pages:   78
Publication Date:   11 December 2018
Format:   Paperback
Availability:   Available To Order   Availability explained
Limited stock is available. It will be ordered for you and shipped pending supplier's limited stock.

Our Price $24.81 Quantity:  
Add to Cart

Share |

A Computer Code for Solving Integer Programming Problems with Variable Resource Levels (Classic Reprint)


Overview

Excerpt from A Computer Code for Solving Integer Programming Problems With Variable Resource Levels A short summary of the history of linear programming and integer programming will put our work in perspective. About the Publisher Forgotten Books publishes hundreds of thousands of rare and classic books. Find more at www.forgottenbooks.com This book is a reproduction of an important historical work. Forgotten Books uses state-of-the-art technology to digitally reconstruct the work, preserving the original format whilst repairing imperfections present in the aged copy. In rare cases, an imperfection in the original, such as a blemish or missing page, may be replicated in our edition. We do, however, repair the vast majority of imperfections successfully; any imperfections that remain are intentionally left to preserve the state of such historical works.

Full Product Details

Author:   Nancy P Kaplan
Publisher:   Forgotten Books
Imprint:   Forgotten Books
Dimensions:   Width: 15.20cm , Height: 0.40cm , Length: 22.90cm
Weight:   0.118kg
ISBN:  

9781334017674


ISBN 10:   1334017670
Pages:   78
Publication Date:   11 December 2018
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Unknown
Availability:   Available To Order   Availability explained
Limited stock is available. It will be ordered for you and shipped pending supplier's limited stock.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Countries Available

All regions
Latest Reading Guide

NOV RG 20252

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List