2018 International Existing Building Code Loose-Leaf Version

Author:   International Code Council
Publisher:   International Code Council
ISBN:  

9781609837518


Publication Date:   18 September 2017
Format:   Loose-leaf
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $260.04 Quantity:  
Add to Cart

Share |

2018 International Existing Building Code Loose-Leaf Version


Overview

Encourages the use and reuse of existing buildings. This code covers repair, alteration, addition and change of occupancy for existing buildings and historic buildings, while achieving appropriate levels of safety without requiring full compliance with the new construction requirements contained in the other I-Codes. Key changes include: Section 410 Accessibility has been relocated to a new Section 305. Chapters 4, 5, 6, 13 and 14 have been relocated resulting in a reorganization and new chapter numbering. Requirements for live loads from Chapters 4 and 8 have been combined and placed in Chapter 3 to apply for all compliance methods. Structural components damaged by snow events must be repaired assuming snow loads for new buildings from the IBC. A new exception is added for loading of existing structural elements next to an addition in buildings designed using the IRC. When a work area includes more than half the building in an alteration, wall anchors must be installed at the roof line along reinforced concrete and masonry walls. Buildings undergoing a change of occupancy shall have live, snow, wind and seismic loads checked. Design loads are based on IBC-level forces. When a change of occupancy occurs placing a building in a higher risk category, the seismic loads on the building must be evaluated using IBC-level forces. Access to the building must be maintained when passing through or near other buildings and structures. Where storm shelters are required based on IBC and ICC 500 for Group E Occupancies, any addition to such existing occupancies where the occupant load of the addition is 50 or more will trigger the construction of a storm shelter. Carbon Monoxide provisions have been added in the Prescriptive Method Additions, Alterations Level 2 Additions, and in Additions for I-1, I-2, I-4 and R Occupancies.

Full Product Details

Author:   International Code Council
Publisher:   International Code Council
Imprint:   International Code Council
Dimensions:   Width: 28.40cm , Height: 5.10cm , Length: 29.50cm
Weight:   1.497kg
ISBN:  

9781609837518


ISBN 10:   1609837517
Publication Date:   18 September 2017
Audience:   General/trade ,  General
Format:   Loose-leaf
Publisher's Status:   Active
Availability:   Available To Order   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

ICC is a leading organization dedicated to developing a single set of comprehensive, coordinated national model construction codes. To date, 48 U.S. states have adopted various international codes from ICC.

Tab Content 6

Author Website:  

Countries Available

All regions
Latest Reading Guide

MRGC26

 

Shopping Cart
Your cart is empty
Shopping cart
Mailing List