Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress

Author:   Congressional Research Service
Publisher:   Createspace Independent Publishing Platform
ISBN:  

9781981318940


Pages:   134
Publication Date:   01 December 2017
Format:   Paperback
Availability:   In stock   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Our Price $44.75 Quantity:  
Add to Cart

Share |

Navy Force Structure and Shipbuilding Plans: Background and Issues for Congress


Add your own review!

Overview

The current and planned size and composition of the Navy, the rate of Navy ship procurement, and the prospective affordability of the Navy's shipbuilding plans have been oversight matters for the congressional defense committees for many years. The Navy's proposed FY2018 budget, as amended on May 24, 2017, requests the procurement of nine new ships, including one Gerald R. Ford (CVN-78) class aircraft carrier, two Virginia-class attack submarines, two DDG-51 class destroyers, two Littoral Combat Ships (LCSs), one TAO-205 class oiler, and one towing, salvage, and rescue ship. On December 15, 2016, the Navy released a new force-structure goal that calls for achieving and maintaining a fleet of 355 ships of certain types and numbers. Key points about this new 355-ship force-level goal include the following: The 355-ship force-level goal is the result of a Force Structure Assessment (FSA) conducted by the Navy in 2016. The Navy conducts an FSA every few years, as circumstances require, to determine its force-structure goal. The new 355-ship force-level goal replaces a 308-ship force-level goal that the Navy released in March 2015. The actual size of the Navy in recent years has generally been between 270 and 290 ships. The figure of 355 ships appears close to an objective of building toward a fleet of 350 ships that was announced by the Trump campaign organization during the 2016 presidential election campaign. The 355-ship goal, however, reflects the national security strategy and national military strategy that were in place in 2016 (i.e., the Obama Administration's national security strategy and national military strategy), while the Trump campaign organization's 350-ship goal appears to have a different origin. Compared to the previous 308-ship force-level goal, the new 355-ship force-level goal includes 47 additional ships, or about 15% more ships. More than 47 ships, however, would need to be added to the Navy's 30-year shipbuilding plan to achieve and maintain the Navy's 355-ship fleet, unless the Navy extends the service lives of existing ships beyond currently planned figures and/or reactivates recently retired ships: CRS estimates that 57 to 67 ships would need to be added to the Navy's FY2017 30-year (FY2017-FY2046) shipbuilding plan to achieve the Navy's 355-ship fleet and maintain it through the end of the 30-year period (i.e., through FY2046).

Full Product Details

Author:   Congressional Research Service
Publisher:   Createspace Independent Publishing Platform
Imprint:   Createspace Independent Publishing Platform
Dimensions:   Width: 21.60cm , Height: 0.70cm , Length: 27.90cm
Weight:   0.327kg
ISBN:  

9781981318940


ISBN 10:   1981318941
Pages:   134
Publication Date:   01 December 2017
Audience:   General/trade ,  General
Format:   Paperback
Publisher's Status:   Active
Availability:   In stock   Availability explained
We have confirmation that this item is in stock with the supplier. It will be ordered in for you and dispatched immediately.

Table of Contents

Reviews

Author Information

Tab Content 6

Author Website:  

Customer Reviews

Recent Reviews

No review item found!

Add your own review!

Countries Available

All regions
Latest Reading Guide

wl

Shopping Cart
Your cart is empty
Shopping cart
Mailing List